Which SR 429 Interchanges Serve Horizon West? (2026)

Quick answer
As of November 2026, three SR 429 interchanges serve the Horizon West area: Seidel Road, Schofield Road and New Independence Parkway. Schofield Road and New Independence Parkway are full interchanges, while Seidel Road is a half interchange that does not offer full movements, per CFX project materials.
| Fact | Figure |
|---|---|
| SR 429 official name | Daniel Webster Western Beltway |
| Southern section (I-4 to Seidel Road) | Florida’s Turnpike, about 11 miles |
| Northern section (Seidel Road to US 441) | CFX, about 23 miles |
| Operator split point | Seidel Road |
| Seidel Road interchange | Half interchange, not full movement |
| Schofield Road interchange | 4 ramps, 2 ramp plazas |
| New Independence Parkway interchange | Full diamond interchange |
Sources: CFX project study for SR 429 from Seidel Road to Tilden Road; CFX news release for the Schofield Road interchange (four ramps, two ramp plazas); Florida’s Turnpike and CFX operating sections that split at Seidel Road; Orange Observer for the New Independence Parkway extension status (all checked November 17, 2026).
In his July 2, 2026 video about Winter Garden, Jared Jones flags commute traps in the south part of Horizon West, including limited on-ramps near Seidel Road. He says certain ramps there run one direction and that you may have to use Schofield Road to head north on SR 429. This page lists the SR 429 interchanges that serve Horizon West and checks that claim against official sources.
Which SR 429 interchanges serve Horizon West?
Three SR 429 interchanges serve the Horizon West area: Seidel Road, Schofield Road and New Independence Parkway. SR 429 is officially the Daniel Webster Western Beltway, and these access points sit along the west side of Horizon West near Hamlin and the town center core.
Schofield Road is a full interchange that CFX built with four ramps and two ramp plazas. New Independence Parkway, formerly the McKinney Road crossing, is described as a full diamond interchange on the west side of Hamlin with an all-electronic toll plaza on the mainline. Seidel Road is the exception, a partial interchange covered below. For general drive-time context, see the Horizon West commute and roads guide.
Is the Seidel Road interchange a full or partial interchange?
The Seidel Road interchange is a partial, half interchange, not a full-movement interchange, and CFX project materials confirm it is not fully built out. CFX’s project study for SR 429 from Seidel Road to Tilden Road is about widening the corridor, not converting Seidel into a full interchange.
Per that study scope and local reporting on it, CFX has indicated it does not plan to add the missing ramps at Seidel Road because of existing and planned development at the site, so drivers who want certain movements onto SR 429 may need to use the next interchange instead. Exact ramp directions and exit numbers were not confirmed against an official CFX diagram in our research, so treat ramp-by-ramp detail as unconfirmed. See the CFX project study page for the current scope.
Who operates SR 429, the Turnpike or CFX?
Both agencies operate SR 429, and the split is at Seidel Road. Florida’s Turnpike Enterprise, part of FDOT, runs the roughly 11 mile southern section from I-4 to Seidel Road, and CFX, the Central Florida Expressway Authority, runs the roughly 23 mile section from Seidel Road north to US 441.
That operator split is why Seidel Road matters beyond its ramps; it is the handoff point between the two toll systems. Current toll rates and lane counts were not verified from primary CFX documents in our research, so confirm those figures on CFX materials before relying on a specific number.
What does Jared Jones say about SR 429 access in Horizon West?
In his July 2, 2026 video about Winter Garden, Jared Jones says SR 429 access in the south part of Horizon West has limitations, and he describes the Seidel Road on-ramps as running in one direction. He says he believes you can only go south there and may have to use Schofield Road to head north, while noting he could not remember the exact direction and does not use that exit often.
Jared’s one-way characterization lines up with CFX’s own description of Seidel Road as a partial interchange without full movements, but his specific direction is his recollection, not a verified ramp detail, so we present it as his observation rather than fact. He also calls the south-side commute potentially detrimental if you hate driving, and says afternoon traffic can back up bumper to bumper toward US 192. Those are his opinions from the July 2, 2026 video, not sourced measurements.
What about the New Independence Parkway extension?
The New Independence Parkway extension is a separate Clermont-side project, and we cover it on its own page rather than repeating it here. Read the New Independence Parkway extension page for that background.
As of a September 21, 2026 local report, crews had finished curb, friction course and median work and were building sidewalks and the Avalon Road tie-in, with the roadway targeted to open to traffic by the end of 2026. We found no confirmation that it had opened between that report and November 17, 2026, so treat the end of 2026 target as a plan, not a completed opening.
Have questions about buying or selling here? Call or text 407-706-5000 or visit jaredjones.com.
Jared Jones Team, Brokered by eXp Realty.
Frequently asked questions
Which SR 429 interchanges serve Horizon West?
Three SR 429 interchanges serve the Horizon West area: Seidel Road, Schofield Road and New Independence Parkway. Schofield Road is a full interchange that CFX built with four ramps and two ramp plazas, and New Independence Parkway is described as a full diamond interchange near Hamlin. Seidel Road is a partial, half interchange that does not offer full movements, per CFX project materials.
Is the Seidel Road interchange a full interchange?
No. The Seidel Road interchange is a partial, half interchange, not a full-movement interchange. CFX project materials, including the study for SR 429 from Seidel Road to Tilden Road, focus on widening the corridor rather than converting Seidel into a full interchange, and local reporting on that study indicates CFX does not plan to add the missing ramps because of development at the site.
Who operates SR 429?
Two agencies operate SR 429, and the split is at Seidel Road. Florida’s Turnpike Enterprise, part of FDOT, runs the roughly 11 mile southern section from I-4 to Seidel Road. CFX, the Central Florida Expressway Authority, runs the roughly 23 mile section from Seidel Road north to US 441. SR 429 is officially named the Daniel Webster Western Beltway.
What does Jared Jones say about Seidel Road ramps?
In his July 2, 2026 video about Winter Garden, Jared Jones describes the Seidel Road on-ramps as running in one direction on SR 429. He says he believes you can only go south there and may have to use Schofield Road to head north, while admitting he could not remember the exact direction. His one-way comment is his recollection, not a verified ramp detail, though it fits CFX’s description of Seidel as a partial interchange.
Is the New Independence Parkway extension open?
As of November 2026, we found no confirmation that the New Independence Parkway extension had opened. A local report dated September 21, 2026 said crews had finished curb, friction course and median work and were building sidewalks and the Avalon Road tie-in, with the roadway targeted to open to traffic by the end of 2026. Treat that end of 2026 date as a plan, not a completed opening, and confirm current status before relying on it.
Is the Schofield Road interchange a full interchange?
Yes. The Schofield Road interchange is a full interchange that CFX built with four ramps and two ramp plazas, per the CFX opening news release. It sits north of Seidel Road and gives drivers the full movements that Seidel Road lacks. The release listed opening toll rates that should be treated as historical, since current toll rates were not verified from primary CFX documents in our research.
Sources
- CFX: SR 429 project study, Seidel Road to Tilden Road (study scope confirms widening Seidel Road to Tilden Road, not a full interchange; checked Nov 17, 2026)
- CFX Newsroom: State Road 429 and Schofield Road Interchange (four ramps and two ramp plazas; listed opening toll rates are historical; checked Nov 17, 2026)
- CFX: SR 429 Capacity Improvements, Schofield Road to Tilden Road (SR 429 capacity improvements project page; checked Nov 17, 2026)
- Orange Observer: New Independence Parkway extension progresses (data as of Sep 21, 2026, end of 2026 opening target, not confirmed open; checked Nov 17, 2026)
- Horizon West News and Info: full interchange feasibility at 429 and Seidel (local news, not official; reports CFX does not plan to add Seidel ramps; checked Nov 17, 2026)
- Jared Jones – Orlando Living (YouTube): Everything New and COMING SOON to Winter Garden 2026! (published Jul 2, 2026)
Related guides
- Winter Garden & Horizon West Real Estate (2026): Buy, Sell and Invest Hub
- Horizon West Commute & Roads Guide 2026: Turnpike, SR 429, SR 516 & Drive-Time Reality Checks
- New Independence Parkway Extension: What It Means for Clermont and Horizon West
- Overnight SR 429 Closures Coming to Horizon West This Week
- Home Depot Could Bring New Store to Horizon West Near SR 429
- Horizon West vs Lake Nona (2026): Home Prices, CDDs, Commutes and Lifestyle Compared